Earthco Construction
Stay Compliant

Erosion Control

Silt fencing, sediment basins, inlet protection, and stabilization measures that meet Lowcountry NPDES and SCDHEC requirements. We keep your site compliant from first disturbance to final stabilization.

  • SWPPP implementation & inspection support
  • Silt fencing & wattles
  • Sediment basins & traps
  • Inlet protection
Call Now(843) 909-2703
  • Licensed & Insured
  • OSHA Compliant
  • Lowcountry Specialists
Get Started

Request a Quote

Tell us about your project. We'll follow up within one business day.

By submitting this form, you agree to be contacted by Earthco Construction regarding your project.

Erosion Control on a Charleston-area Earthco project
Overview

What we deliver on every erosion control project.

Stormwater compliance is non-negotiable in coastal South Carolina. Earthco installs and maintains the erosion and sediment control measures required by SCDHEC, NPDES, and local jurisdictions so your project stays in good standing through every inspection.

We treat erosion control as a live system — adjusted with the weather, the phasing, and the site conditions — rather than a one-time install. That keeps both your site and your schedule protected.

Scope of Work

  • SWPPP implementation & inspection support
  • Silt fencing & wattles
  • Sediment basins & traps
  • Inlet protection
  • Construction entrances
  • Slope & ditch stabilization
  • Seeding, mulching & matting
  • Maintenance through final stabilization
How We Work

Our process, step by step.

Predictable execution from kickoff through close-out — so the trades following us can do their jobs without surprises.

01STEP

Review the Plan

We review the approved SWPPP and identify the install sequence based on disturbance phasing.

02STEP

Install Before Disturbance

Perimeter controls and construction entrances go in before any earthwork begins.

03STEP

Maintain Through Build

Controls are inspected, repaired, and added to as the site evolves — keeping you inspection-ready.

04STEP

Stabilize & Close Out

Permanent stabilization and removal of temporary measures once disturbed areas are fully restored.

Why Earthco

The right partner for erosion control in the Lowcountry.

Safety & Compliance

OSHA-compliant operations and full adherence to SCDHEC and local jurisdiction requirements.

On-Schedule Delivery

Production-driven crews keep your vertical construction timeline intact.

Lowcountry Specialists

Built for the soils, stormwater, and regulatory environment of coastal South Carolina.

FAQ

Common questions.

We support our clients' SWPPP inspections by maintaining controls and addressing deficiencies promptly. Formal inspections are typically performed by the qualified inspector of record.

Yes. We routinely mobilize quickly to correct deficiencies and bring sites back into compliance ahead of follow-up inspections.

Yes — seeding, mulching, and erosion matting on slopes and ditches as part of final close-out.

Related Services

Pair this with…

View All Services
Aerial view of a detention pond and shaped site on an Earthco Construction project

Ready to Break Ground?

Let's talk about your next project. Our team is ready to deliver the sitework your build depends on.